ACU-RITE VRO 300T User Manual
Page 29

Program Operations
VRO 300T
22
Running a Program
To run a program, move to the first step and press the
RUN
softkey. You
must now execute the step and, when you are done, press the
NEXT
softkey
to run the next step.
You can run a program starting from any step; just move to the step you
want to start with and press
RUN
. Remember that Position steps are
normally preceded by a Tool step that is required to calculate the correct tool
offsets.
Tool Steps
If the step is a Tool step, the new tool offsets are used and the new tool
number is indicated in the status bar. Check the tool that you are using and
change it if necessary.
Position Steps
If the step is a Position step, the programmed position is automatically preset
into the axis displays. The axis display is switched to incremental. You can
now move to zero in each axis.