beautypg.com

Sequence of operation, Subsequent operation – York ECO2 YPAL 050 User Manual

Page 87

background image

87

JOHNSON CONTROLS

FORM 100.50-NOM6 (1207)

5

Intelli-Start will only work on a Constant Volume

system using a space sensor.

Intelli-Start will only work when the internal

scheduling feature is used. It will not work using
a hard wired or communicated Occupied com-
mand.

Intelli-Start will only function during the fi rst

occupied period of each day.

Sequence of Operation

First day of heating or cooling operation

Two hours prior to the start of the occupied period

the Simplicity Control will compare the space
temperature to the “CV OCCUPIED COOLING”
or the “CV OCCUPIED HEATING” set points.

Heating

operation

– If the space temperature is 1.5° F or more

below the “CV OCCUPIED HEATING” set
point the Simplicity Elite control will stage on
the heat using the normal heating with space
sensor logic.

– The Simplicity Elite control will record the

space temperature and how long it takes to
bring the space temperature to the “CV OC-
CUPIED HEATING”
set point.

– When the “CV OCCUPIED HEATING” set

point is reached the Simplicity Elite control
will divide the elapsed time into 5-minute
increments.

– The Simplicity Elite control will determine

how many 0.1° F the temperature was below
the “CV OCCUPIED HEATING” set point.

– The Simplicity Elite control will then cal-

culate how many 0.1° F were satisfi ed per
5-minute increment.

– This number will be recalculated each day.

– The Simplicity Elite control also records the

outdoor temperature when the above calcula-
tions are made.

Cooling

operation

– If the space temperature is 1.5° F or more

above the “CV OCCUPIED COOLING” set
point the Simplicity Elite control will stage on
cooling operation using the normal Cooling
with space sensor logic.

– The Simplicity Elite control will record the

space temperature and how long it takes to
bring the space temperature to the “CV OC-
CUPIED COOLING”
set point.

– When

the

“CV OCCUPIED COO0LING” set

point is reached the Simplicity Elite control
will divide the elapsed time into 5-minute
increments.

– The Simplicity Elite control will determine

how many 0.1° F the temperature was above
the “CV OCCUPIED COOLING” set point

– The Simplicity Elite control will then cal-

culate how many 0.1° F were satisfi ed per
5-minute increment.

– This number will be recalculated each day.

– The Simplicity Elite control also records the

outdoor temperature when the above calcula-
tions are made.

Subsequent Operation

Each morning two hours before the scheduled

occupied start time the Simplicity Elite control
looks at the space temperature and the “CV OC-
CUPIED COOLING”
and “CV OCCUPIED
HEATING”
set points and determines if there is
a need for cooling or heating operation.

Based on which need is identifi ed the Simplicity

Elite control will calculate the number of 0.1°
F increments the space temperature is from set
point and multiple this value time the previous
days calculation on the number of 0.1° F the unit
can satisfy in 5 minutes. This will determine
how many minutes prior to the beginning of the
occupied period the control will need to start the
heating or cooling operation.

If cooling mode is selected the Simplicity Elite

control will also compare the current outdoor
temperature to the outdoor temperature recorded
during the previous days start up period.

– If the current outdoor air temperature is

10.0° F or more above the previous day the
Simplicity Elite control will add 5 minutes to
the above calculated recovery time for every
10.0° F difference.

This manual is related to the following products: