beautypg.com

Call scheduling, Introduction to call scheduling, Configuring call scheduling – ZyXEL Communications ZyXEL ZyWALL 2WE User Manual

Page 283: Chapter 25 call scheduling, 1 introduction to call scheduling, 2 configuring call scheduling

background image

ZyWALL 2 and ZyWALL 2WE

Call Scheduling

25-1

Chapter 25

Call Scheduling

Call scheduling allows you to dictate when a remote node should be called and for how long.

25.1 Introduction to Call Scheduling

The call scheduling feature allows the ZyWALL to manage a remote node and dictate when a remote node
should be called and for how long. This feature is similar to the scheduler in a videocassette recorder (you
can specify a time period for the VCR to record).

25.2 Configuring Call Scheduling

From the main menu, enter 26 to access Menu 26 - Schedule Setup as shown next. You can apply up to 4
schedule sets in Menu 11.1 - Remote Node Profile.

Figure 25-1 Menu 26 - Schedule Setup

Lower numbered sets take precedence over higher numbered sets thereby avoiding scheduling conflicts. For
example, if sets 1, 2, 3 and 4 are applied in the remote node, then set 1 will take precedence over set 2, 3

Menu 26 - Schedule Setup

Schedule

Set #

------

1

2

3

4

5
6

Name

------------------

______________

______________

______________

______________

______________
______________

Schedule

Set #

------

7

8

9

10

11
12

Name

------------------

______________

______________

______________

______________

______________
______________

Enter Schedule Set Number to Configure=

Edit Name=


Press ENTER to Confirm or ESC to Cancel: