beautypg.com

11] maintenance, Maintenance cycle and maintenance items – Sharp SF-1120 User Manual

Page 119

background image

[11] MAINTENANCE

1. Maintenance cycle and maintenance items

Maintenance of the SF-1020/1120 should be performed at every 50K.

= Lubricate,

F

= Clean,

v

= Adjust,

b

= Replace/attach,

ê

= Shift position

= Check (Clean, replace, or adjust if necessary.)

*

The toner consumption and the waste toner bottle replacement cycle are those when the reference chart is used.

Section

Parts

50K

100K

150K

200K

Same cycle later

Remark

Developing

Developer

b

b

b

b

DV blade

F

b

F

b

DV side seal (F/R)

F

b

F

b

Process peripheral

Drum

b

b

b

b

Cleaner blade

b

b

b

b

Toner reception seal

b

b

b

b

Drum separation seal

b

b

b

b

Charging plate (saw teeth)

F

b

F

b

MC case

F

F

F

F

Screen grid

F

b

F

b

Discharge lamp

F

F

F

F

Blank lamp

F

F

F

F

Drum mark sensor

F

F

F

F

Drum density sensor

F

F

F

F

Waste toner bottle

b

b

b

b

TC/SC case

F

F

F

F

TC/SC wire

F

b

F

b

Suction

Suction belt

F

F

F

F

Ozone filter

Ozone filter

F

F

Fusing

Upper heat roller

b

b

Lower heat roller

b

b

Upper separation pawl

F

b

F

b

Lower separation pawl

b

b

Thermistor

F

F

F

F

Heat roller gear

b

b

Optical

Mirror/lens/reflector

F

F

F

F

Drive wire/pulley

Rails

Table glass

F

F

F

F

Dust-proof glass

F

F

F

F

Paper feed
(including multi paper
feed section)

Pick-up roller

F

(

)

F

(

)

F

(

)

b

Paper feed roller

F

(

)

F

(

)

F

(

)

b

Separation roller

F

(

)

F

(

)

F

(

)

b

Do not use alcohol.
Wipe with water.

Torque limiter section

b

Transport

PC roller pair

F

F

F

F

Transport roller pair

F

F

F

F

Transport paper guides

F

F

F

F

Transport system sensors

F

F

F

F

Drive

Belts

F

F

F

F

Gears
(specified gears only)

Image

v

v

v

v

11 – 1

This manual is related to the following products: