beautypg.com

Redundant handbots, Initialization, Figure 1-4 – Sun Microsystems StreamLine SL8500 User Manual

Page 50

background image

Robotics Interface Module

10 StreamLine™ SL8500 Modular Library System User's Guide • March 2007

Revision K • 96154

Redundant HandBots

Make sure that the service representative completes the following are prerequisite to

the operation of the redundant HandBots (two HandBots per rail):

1. Install the Service Safety Door

2. Upgrade the HandBot assemblies

3. Upgrade the library firmware (FRS 2.50 or later)

4. Upgrade the HBS assemblies; these have an “X” on the upper left of the assembly

5. Upgrade the HBN card

6. HBQ rail terminator cards

7. ENDSTOP bar code inserts in the 3-cell arrays at the ends of all rails

8. Additional DC power supplies

Initialization

When power is applied to the library, each HandBot begins its initialization routine.

The sequence for initialization is in the following order:

FIGURE 1-4

HandBot on the Power Rail

)