beautypg.com

Appendix, About rack mounting, Attaching the rack-mount angles – Roland V-160HD SDI/HDMI Streaming Video Switcher User Manual

Page 105

background image

105

Appendix

About Rack Mounting

Attaching the included rack-mount angles lets you install the V-160HD in a 19-inch rack.

Attaching the Rack-Mount Angles

1 .

Turn off the power to the V-160HD and disconnect the

power cord and all connection cables.

2 .

Use the included mounting screws (three per side) to

attach the rack-mount angles.

* Both of the rack-mount angles have the same shape; there is no

difference between left and right.

NOTE

When uninstalling the rack-mount angles

Before uninstalling the rack-mount angles, turn off the power to

the V-160HD and disconnect the power cord and all connector

cables.

Important Notes on Rack Mounting

¹

Before mounting, turn off the power to the V-160HD and detach

the power cord and all connection cables.

¹

When mounting the unit, take care not to pinch your fingers etc.

¹

To prevent incorrect operation or malfunction, take care not to

subject areas protruding beyond the rack to accidental impact.

¹

To ensure room for connectors and cables, leave 2U of clearance

above the unit.

¹

Use all threaded holes (at 2 locations on each side, for a total

of 4) to secure the unit to the rack using screws. Screws for

rackmounting are not included.

¹

Never transport the rack with the unit installed in it. The impact of

shaking or vibration might deform the rack-mount angles.

¹

When mounting the V-160HD in a rack, pay attention to the

following points to ensure efficient cooling.

– Install in a well-ventilated location.

– Avoid blocking the cooling-fan intake and exhaust ports on the

side panels of the V-160HD.

– Avoid mounting the unit in a sealed-type rack. Warm air within

the rack cannot escape, making efficient cooling impossible.

– If the back of the rack cannot be opened, install an exhaust port

or ventilation fan at the top back surface of the rack where warm

air collects.

¹

Also read the “Placement” (the leaflet “USING THE UNIT SAFELY” and

the “Startup Guide”) under “IMPORTANT NOTES.”