5 poe schedule – PLANET IGS-10020HPT User Manual
Page 339
![background image](https://www.manualsdir.com/files/865324/content/doc339.png)
User’s Manual of IGS-10020PT / IGS-10020HPT
339
4.16.5 PoE Schedule
The PoE Schedule of the IGS-10020PT / IGS-10020HPT features two advanced PD power control functions:
PD power ON/OFF Schedule
Schedule Power Recycle
PD Power ON/OFF Schedule
Under the trend of energy saving worldwide and contribute to environment protection on the earth, the IGS-10020PT /
IGS-10020HPT can effectively control the power supply besides its capability of giving high watts power. The “PoE schedule”
function helps you to enable or disable PoE power feeding for each PoE port during specified time intervals and it is a powerful
function to help SMB or Enterprise save power and money.
Schedule Power Recycle
The IGS-10020PT / IGS-10020HPT allows each of the connected PoE powered device to reboot in a specific time each week.
Therefore, it will reduce the chance of powered device crash resulting from buffer overflow.