beautypg.com

Figure 153 ups cable entry-bottom, Figure 153 ups cable entry—bottom, Up s – Emerson Series 600T User Manual

Page 157

background image

Installation Drawings

145

Figure 153 UPS cable entry—bottom

( +

)

B

us

(-

) B

us

Gr

ou

nd

B

u

s

Li

eb

e

rt

F

S

C

abi

ne

t

U

n

it

N

Li

eb

e

rt

FS

Ca

b

in

e

t

Un

it

N

Li

e

b

er

t F

S

Ca

b

in

et

Un

it

N

3-

P

has

e

Ou

tp

ut

UP

S

CA

B

INE

T

3-

P

ha

se

In

p

ut

NOTES

1.

All

ca

bl

es

sho

u

ld

b

e rou

ted

b

efore

bolti

n

g ca

bi

nets t

og

ether.

2.

All Liebert FS cabinets sho

w

n w

ith front do

or o

pen.

3.

Cabine

ts

show

n connected as

one s

ystem.

W

h

en

con

n

ected

to a U

P

S

mo

du

le

, a

ll pow

er

and control wiring supplied by

custom

er (standard)

or Liebert (o

ption).

4.

See installation,

operatio

n and

ma

int

en

ance manua

l f

or ad

di

tiona

l in

formati

on.

5.

All

ex

tern

al

w

iri

ng

is

to

be in

accordance with nation

al

a

n

d loca

l el

ectri

cal codes.

6.

Bus wi

rin

g must be capa

bl

e of ha

ndl

ing

total

lo

ad current.

7.

Power connection must be connected with

a bus structure or to

a

single

point

conn

ect

ion at the UPS (Do not da

isy-

cha

in)

.

This manual is related to the following products: