beautypg.com

SMA SC 200 User Manual

Page 36

background image

Parameters

SMA Solar Technology AG

36

SC-BEN100262

User Manual

HzCtlMinTm

Triggering time for the minimum threshold values at underfrequency in Level 3.

Grid connection
GriGrdMonTm

This parameter defines the time span required to meet the switch-on conditions,
before the Sunny Central can be reconnected to the energy supply grid.

VCtlOpMinNom

This parameter determines the minimum grid voltage, as a percentage of the
nominal voltage VRtg, which must be present at the Sunny Central for it to
reconnect to the energy supply grid.

VCtlOpMaxNom

This parameter defines the maximum grid voltage, as a percentage of the
nominal voltage VRtg, which may be present at the Sunny Central for it to
reconnect to the energy supply grid

HzCtlOpMin

This parameter determines the minimum grid frequency which must be present
at the Sunny Central for it to reconnect to the energy supply grid.

HzCtlOpMax

This parameter defines the maximum grid frequency which may be present at
the Sunny Central for it to reconnect to the energy supply grid.

Mpp Limit Val.
VmppMin *

Minimum MPP voltage required for the Sunny Central to feed.

dVreference

MPP tracking is possible within a range equal to 2 x dVreference. As soon as
the voltage breaches these voltage limits, the inverter changes to "MPP Search"
mode.
Default setting: 80 V
Recommendation for operation with thin-film modules: 120 V

PsearchMpp *

If the currently measured PV power drops below the value PsearchMpp for the
duration of TsearchMpp, the Sunny Central restarts the search for the MPP.

TsearchMpp *
MPP Tracking
dVtrack *

During MPP tracking, the inverter changes the voltage in "dUtrack" steps at
"TcheckMpp" intervals before it selects the MPP.

TcheckMpp *
Mpp Factor

The start value for MPP tracking is obtained by multiplying the "Mpp Factor"
parameter by the measured open circuit voltage.
Factory setting: 0.80
Recommendation for operation with thin-film modules: 0.70

TrackCnt

During operation, the Sunny Central searches the maximum power point. It
checks the voltage up to seven times (default setting) in one direction, e.g.
always toward the higher voltage. After the seventh time (at the latest), it also
searches below the last voltage, in order to check whether the maximum power
point has decreased. If, for example, the Sunny Central finds a lower power
point upon the third increase, it searches below the most recently checked
voltage.

Start requirement
Operating mode * MPP is set as a condition for starting up the inverter.

Parameters

Description of function

This manual is related to the following products: