11 Periodic Actions
SMA Solar Technology AG
50
PPC-BE-P7-en-13
Operating Manual
11.1.2 Inserting the Cable in the Cable Gland
Procedure:
1. Remove the filler plug from the cable gland.
2. Remove the rubber seal from the cable gland.
3. Adjust the rubber seal to the diameter of the cable to be inserted:
• Remove the appropriate number of sealing rings from the
rubber seal.
4. Lead the cable through the swivel nut of the cable gland. Ensure that the thread of the swivel nut is facing upwards.
5. Lead the cable above the swivel nut sideways through the rubber seal.
6. Insert the rubber seal with the cable into the cable gland.
7. Cut the cable to length.
8. Tighten the cable gland.
/05*$&
Damage to the Power Plant Controller due to moisture penetration
Moisture can penetrate the Power Plant Controller due to unsealed cable glands.
• Only remove the number of sealing rings from the rubber seal in the cable gland to match the cable cross-section.
Unused cable glands
• Do not take the filler plugs out of the unused cable glands. This keeps the Power Plant Controller sealed.
Cable diameter
Number of sealing rings to be removed
4.5 mm to 5.0 mm
0
4.5 mm to 7.5 mm
1
7.0 mm to 10.0 mm
2
9.5 mm to 13.0 mm
3