7  Operation

Operating Manual

PPC-BE-P7-en-13

31

– Make the desired settings in the remaining columns:

7.6.4 Adjusting the Configuration of the Network Analyzers

At the point of interconnection, the current values for active power, reactive power, voltage and frequency are measured.

The measured values are captured in up to three network analyzers. For each variable, a network analyzer can be

selected as the source for the default value. A second network analyzer independent of the first network analyzer can be

selected as the source for the redundant second measured value. If one of the default values fails, the redundant second

measured value will be used in its place.
The measured values are either queried by the Power Plant Controller via Modbus using a network analyzer or submitted

to the Power Plant Controller as analog input signals.
In order to ensure the correct processing of the measured values, the network analyzer used must be configured.

After commissioning the Power Plant Controller, you can still change the IP address of the network analyzer, adjust its

device type and assign it a unique name.
If a network analyzer is to be serviced or replaced, measurements by this network analyzer should be deactivated in

advance.

Column

Setting

MB Time Server

Activation (TRUE) / deactivation (FALSE) of the specification of time through an external

Modbus time server

Q at Night

Activation (TRUE) / deactivation (FALSE) of the "Q at Night: function in the inverters if this

function is available

Qac Nom

Input of the nominal reactive power as a total of all inverters connected to the Cluster

Controller

first Q limit

The first threshold of the reactive power for all inverters connected to the Cluster Controller.

If this lower reactive power limit is reached during operation, the inverters no longer receive

higher output values initially. The effectiveness of this threshold is however canceled if the

inverters would be able mathematically to supply reactive powers above the second

threshold.

second Q limit

The second threshold of the reactive power for all inverters connected to the

Cluster Controller.
If the first Q limit and the second Q limit were selected identically (default setting),

this function is deactivated.