1 gener al inf or mation on cy cles – HEIDENHAIN TNC 310 (286 140) User Manual
Page 107

95
HEIDENHAIN TNC 310
Calling the Cycle
Prerequisites
The following data must always be programmed before a
cycle call
■
BLK FORM for graphic display (needed only for
test graphics)
■
Tool call
■
Direction of spindle rotation (M functions M3/M4)
■
Cycle definition (CYCL DEF).
For some cycles, additional prerequisites must be
observed. They are described with the individual cycle.
The following cycles become effective automatically as soon as
they are defined in the part program. These cycles cannot and must
not be called:
■
Cycles for circular and linear hole patterns
■
Coordinate transformation cycles
■
DWELL TIME cycle
All other cycles are called as described below.
If the TNC is to execute the cycle once after the last programmed
block, program the cycle call with the miscellaneous function M99
or with CYCL CALL:
ú
Press the CYCL CALL soft key to program a cycle
call
ú
Enter a miscellaneous function, for example for
coolant supply.
If the TNC is to execute the cycle automatically after every
positioning block, program the cycle call with M89 (depending on
machine parameter 7440).
To cancel M89, enter
■
M99 or
■
CYCL CALL or
■
CYCL DEF
8.1 Gener
al Inf
or
mation on Cy
cles