beautypg.com

Initial start up – Scotsman CME506R AutoIQ User Manual

Page 15

background image

Initial Start Up:

1. Remove the front, top and side panels.
2. Locate and open the receiver “king” valve.
3. Locate the AutoIQ Controller.
4. Switch on the electrical power. Note that the

LED or indicator lights all flashed on briefly.
5. Open the water supply valve.
6. Push and release the Freeze cycle push button

(the Freeze indicator light will blink until the

compressor starts). The next several operations

are automatic.
Initial Start (30 seconds)

The Freeze light will begin to blink.

The Hot Gas Solenoid valve will be open.

The inlet water valve will open to fill the

reservoir. The inlet water valve will shut off

when the reservoir is full.

The water pump starts to pump water.

The water solenoid opens again to refill the

reservoir.

After 30 seconds the liquid line valve is

energized, allowing the compressor &

remote fan motor to start.

5 seconds later the hot gas valve closes.

Freeze Cycle:

The Freeze indicator light will come on. The

machine will stay in a Freeze cycle for many

minutes. Slush may appear in the reservoir,

it is temporary and normal.

Under certain conditions, the pump may stop

for a few seconds and then the inlet water

valve may open to refill the reservoir.

The freeze cycle will continue until the water

level in the reservoir drops to its factory set

point, then the Harvest Cycle will begin.

Harvest Cycle:

The Harvest indicator light will be ON,

The hot gas valve will open.

The water pump will switch off. The pump

will restart part way thru the harvest cycle.

The Inlet water valve will open. The machine

will fill the reservoir and overflow it for a

specified number of seconds then shut off.

The harvest cycle may still be in progress.

The Bin Full indicator light will go on and off

as ice falls from the evaporators.

7. Machines are shipped from the factory with the

purge level set to accommodate average water

conditions. To achieve optimal machine

performance, set the purge level to the minimum

setting.
Note: While the amount of water purge is

adjustable, only those installations with a water

supply known to be excellent (very low TDS)

should adjust to the minimum setting. See page 16

for purge adjustment procedures.
8. The machine’s correct cube size should result

in ice that falls from the evaporator in vertical strips

of 8 - 10 cubes, the top two cubes may fall

individually.
9. After a few minutes the machine will return to a

freeze cycle.
10. Fill out the Customer Evaluation and Warranty

Registration. Send it to Scotsman.
11. Return all panels to their normal positions.
12. Inform the user of the location and telephone

number of the local service company. Also inform

the user of the required maintenance of the

machine.

Operational Notes:
1. The machine will only shut off on Bin Full at the

end of the Harvest Cycle after the bin fills. That

last harvest cycle will be for Maximum Harvest

Time.
2. After switching off on Bin Full, if ice is removed

from the bin, the machine will not restart until it has

been off for 5 minutes. If the Freeze button is

pushed, the machine will restart immediately.
3. If the bin controls sense a bin full signal before

any water is used (float stem up), the machine will

shut off on bin full.

CME506R, 656R, 806R: AutoIQ Cubers

January 2000

Page 15

This manual is related to the following products: