beautypg.com

After utility connections – Scotsman CME506R AutoIQ User Manual

Page 12

background image

After Utility Connections:

1. Level the cabinet, use the leg levelers on the

end of the legs to adjust the cabinet height.
2. Wash out the bin. If desired, the interior of the

bin could be sanitized.
3. Locate the ice scoop (if supplied) and have it

available for use when needed.
4. Switch on the electrical power. Do not start the

machine for 4 hours.

Final Check List:

1. Is the unit located indoors in a controlled

environment?
2. Is the unit located where it can receive adequate

cooling air?
3. Has the correct electrical power been supplied

to the machine?
4. Have all the water supply connections been

made?
5. Have all the drain connections been made?
6. Has the unit been leveled? Level the unit at the

water reservoir.
7. Have all unpacking materials been removed?
8. Is the water pressure adequate?
9. Have the drain connections been checked for

leaks?
10. Has the bin interior been wiped clean or

sanitized?
11. Have any water filter cartridges been

replaced?
12. Check all refrigerant lines and conduit lines, for

vibration or rubbing and possible failure. Adjust as

needed.
13. After 4 hours of electrical power, proceed to

Initial Start Up.

CME506R, 656R, 806R: AutoIQ Cubers

January 2000

Page 12

This manual is related to the following products: