938691

Inspection Mode Testing 3-3


Reviewing NDT Inspection Results

Project Panel

Item

Description

1

Lists eZ-NDT Projects

2

Shows a picture of the part

3

Resets the counts to zero

4

Displays name of company and part number.

The 2 fields are edited from the Acquisition Tab
under Edit / Configuration.

5

Serial number

6

Name of inspector

7

Automatically increments the serial number.

8

Pass: Displays the quantity of parts that passed.

Fail: Displays the quantity of parts that failed.

Curr: Displays the number of parts that have
consecutively passed or failed since the end of

the previous sequence. For example: If we had

56 parts in a row pass, Curr would display “56

Pass,” If the next part failed Curr would display

“1 fail.” If the very next part failed Curr would

display “2 fail” etc.


The Project Panel contains the NDT inspection results since the last time the
button (3) was pressed. The total number of Passed and Failed parts, as well as the consecutive count, are
listed (8).


The Since label displays the date and time that the button (3) was last clicked.
The button clears the entries for Passed, Failed, Current (Consecutive Count),
and resets the date and time [under the Since label]. Clicking the button does not erase the data stored in
the history file.

Note that the date and time of the last NDT inspection is displayed in the upper left corner of the panel.