beautypg.com

Gasboy CFN Series Site Controller III User Manual

Page 83

background image

MDE-4298D CFN Series Site Controller III Installation Manual · September 2009

Page 79

Manual Override Test

Testing

11

Turn off the breakers for all pumps and/or remote dispensers and the SC and other
components.

12

Replace all wiring connectors (green) previously removed from the Pump Control I/O PCB
assembly.
Note: The manual override test will uncover most point-to-point AC wiring mistakes that can

occur. The automatic test performed during the system startup will complete the
verification of correct AC wiring to the pump/remote dispensers. The automatic test
should only be performed at the startup.