MDE-4298D CFN Series Site Controller III Installation Manual · September 2009

Page 25

Conduit Layout/Installation Specifications

System Layout

• Consult the applicable section of this manual for specific system installation requirements.
• The RS-485 junction box must be grounded as specified in

“Power Requirements”

on

page 32

.

• When used with Fuel Point, an extra dedicated junction box is supplied and should be

installed in the pump/dispenser. A separate, dedicated conduit should be run between the
junction box and the FPR. Refer to C35628 Fuel Point Reader Installation and Retrofit
Instructions Manual, for details.

• When using an ICR2, refer to MDE-2713 Universal Distribution Box Installation Manual

for conduit layout/installation requirements of the Two-wire Current Loop
communications. For an overview of ICR2 Communication wiring, refer to

“ICR2

Communication Wiring”

on

page 37

.