6 - testing, Installation completion checklist, 6 – testing – Gasboy CFN Series Site Controller III User Manual
Page 81

MDE-4298D CFN Series Site Controller III Installation Manual · September 2009
Page 77
Installation Completion Checklist
Testing
6 – Testing
Installation Completion Checklist
The information below should be reviewed to help verify proper installation of the CFN
system prior to testing pumps and/or remote dispensers in the manual override position.
• Are the CFN system components located in the proper environment as described in
on
• Is there adequate clearance around the ICRs (refer to
,
and
on
)?
• Is all the wiring inside the metal conduit, except as noted in
• Is the AC and DC wiring in separate conduits, troughs, and so on? If they are not, and if
the AC and DC wires share the conduit, a shielded cable must be used as specified in
,
on
on
, or
“Pulser Wiring and Configuration”
• Are the CFN system components on a separate dedicated breaker (refer to
)
• Are pumps over 3/4 HP at 120/240 VAC or 1-1/2 HP at 240 VAC equipped with a starter
“Pump/Remote Dispenser Wiring”
on
• Is the correct gauge wire installed for the following:
)?
- Pumps (refer to
“Pump/Remote Dispenser Wiring”
- Remote dispensers (refer to
“Pump/Remote Dispenser Wiring”
)?
- Pulsers (refer to
“Pump/Remote Dispenser Wiring”
- SHMs (refer to
on
• Are the communication lines under the maximum allowable distance for the following:
- RS-232 - 100 feet (refer to
)?
- RS-485 - 1000/1500 feet (refer to
on
- RS-422 (SHMs) - 1500 feet (refer to
)?
• If the system has an external modem, is the phone line installed (refer to
on
)?
• Is there fuel in the tanks?