beautypg.com

Configure the board for bench-top operation, Configure the board for bench-top operation –8 – Altera Cyclone II EP2C35 PCI Development Board User Manual

Page 34

background image

3–8

Core Version 4.0.0

Altera Corporation

Cyclone II EP2C35 PCI Development Board Reference Manual

May 2005

Configure the Board for Bench-Top Operation

Configure the
Board for
Bench-Top
Operation

The development board is initially configured for installation in a
conventional PCI slot. Five standoffs and five screws are included for
bench-top operation.

To configure the board for bench-top operation, follow these steps:

1.

Position the board face up with the PCI bracket on the left.

2.

Insert a screw in the hole next to PWR SWITCH (SW1) and fasten a
standoff to the screw.

3.

Insert a screw in the hole next to RS-232 LEDs (D17 and D18) and
fasten a standoff to the screw.

4.

Insert a screw in between J6 and J7 and fasten a standoff to the
screw.

5.

Insert a screw in the hole next to external power jack (J2) and fasten
a standoff to the screw.

6.

Insert a screw in the lower right corner next to J11 and fasten a
standoff to the screw.

To configure the board, perform the following steps:

1.

Create a POF for your design.

2.

Write the POF into flash memory.

3.

Select the user-programmable EPCS64 device by setting the switch
(J3) to the Down position.

4.

Force the device to reconfigure by pressing the RECONFIG
push-button (S2).