2 creating a date-based schedule – Echelon i.LON 100 e2 Internet Server User Manual
Page 163

i.
LON 100 Internet Server Programmer’s Reference
10-11
10.2.1.2.2
Creating a Date-Based Schedule
Table 54 lists and describes the properties that should be defined within each
element.
Table 54 Date-Based Schedule Properties
Property Description
The index number for the date-based schedule.
A user-defined description of the date-based schedule. This description
can be up to 228 characters long.
The priority to be assigned the schedule, from 0 (highest priority) to
255 (lowest priority). The priority chosen here must be greater than or
equal to the priority assigned to the data point when the Event
Scheduler attempts to update the data point. If it is not, the data point
will not be updated successfully. For a more detailed description of
data point priority levels, see Data Point Values and Priority Levels on
page 3-5.
The exceptions for the date-based schedule specify the dates on which
the date-based schedule will be active. These exceptions are signified
by a list of
by its name (UCPTexceptionName).
You will define the name of an exception and the dates is applies to
when you create it with the Event Calendar application. For more
information on this, seeEvent Calendar on page 12-1.