beautypg.com

Check supplies and prepare equipment, Check supplies, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 77

background image

JT60/JT60 All Terrain Operator’s Manual

Prepare - 77

Check Supplies and Prepare Equipment

Check Supplies and Prepare Equipment

Check Supplies

receiver/transmitter or tracker with spare batteries

beacons with new and spare batteries

two-way radios with new and spare batteries

hydraulic wrench (see “Hydratong Wrenches” on page 141)

transition sub

anchoring equipment and accessories

bits, screens, nozzles (see “Downhole Tools” on page 136)

adapters, pipe, beacon housings

marking flags or paint

water and additional hoses

fuel

drilling fluid additives (see “Drilling Fluid” on page 128)

spare fuses

keys

backreamers, swivels, pulling devices (see “Backreamers” on page 138)

wash down hose and spray gun

duct tape

spray lubricant

tool joint compound (see “Recommended Lubricants/Service Key” on page 170)

electrically insulating boots and gloves. Boots must have high tops and meet the electric hazard
protection requirements of ASTM F2413 when tested at 14,000 volts. Tuck legs of pants completely
inside boots.

personal protective equipment, such as hard hat and safety glasses

notepad and pencil

This manual is related to the following products: