Add pipe, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual
Page 104

Conduct a Bore - 104
JT60/JT60 All Terrain Operator’s Manual
Add Pipe
Add Pipe
1.
Press drilling unit throttle switch until engine is at full throttle.
2.
3.
Break joint at SaverLok.
4.
Load pipe.
Manual Pipeloader Controls
Automated Pipeloader Control
•
Clamp pipe joint. See “Clamp Pipe” on
page 98.
•
Locate drill head.
•
Engage front wrench until pipe is clamped
and pressure develops.
•
Slowly move carriage back until
movement stops.
•
Slowly rotate spindle counterclockwise.
Carriage will move back as threads
separate.
•
After threads are fully separated, stop
rotation and move carriage to back of
frame.
•
Clamp pipe joint. See “Clamp Pipe” on
page 98.
•
Locate drill head.
•
Engage front wrench until pipe is clamped
and pressure develops.
•
Slowly move carriage back until
movement stops.
•
Slowly rotate spindle counterclockwise.
Carriage will move back as threads
separate.
•
After threads are fully separated, stop
rotation and move carriage to back of
frame.
•
While carriage is moving, green control
cycle light will come on. Grippers will grip,
pipe will be lubed, and then green control
cycle light will flash.
Manual Pipeloader Controls
Automated Pipeloader Control
•
Make sure shuttle stop is properly
positioned on pipeloader and lift arms are
completely lowered.
•
Close grippers.
•
Move pipe to spindle and lube lower
threads.
•
Raise pipe in box.
•
Make sure shuttle stop is properly
positioned on pipeloader.
•
When carriage is moved to back of drill
frame, press RESUME. Green control
cycle light will come on.
•
Pipe will be moved to spindle, front
threads will be lubed, pipe in box will be
lifted, and then green control cycle light
will flash.