Planning, Setting up at jobsite, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual
Page 56
Operation Overview - 56
JT60/JT60 All Terrain Operator’s Manual
Planning
Planning
1.
Gather information about jobsite. See page 61.
2.
3.
Classify jobsite. See page 64.
4.
5.
Select drilling mode based on jobsite conditions. See page 79.
6.
Check supplies and prepare equipment. See page 77.
7.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 91.
3.
Assemble drill string. See page 99.
4.
Position drilling unit and frame. See page 95.
5.
Assemble strike system. See page 123.
6.
Anchor drilling unit. See page 119.
7.
Connect fluid system. See page 95.
8.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
This manual is related to the following products: