Prepare - 74

JT60/JT60 All Terrain Operator’s Manual

Plan Bore Path

JT60 Power Pipe Forged

Minimum depth (D)

Entry pitch (A)

Setback (B)

Depth to begin steering (S)

4’ 10”

18”/10.0°

41’ 12”

2’ 3”

5’ 7”

19%/11.0°

44’ 10”

2’ 6”

6’ 5”

21%/12.0°

47’ 9”

2’ 8”

7’ 3”

23%/13.0°

50’ 6”

2’ 11”

8’ 2”

25%/14.0°

53’ 4”

3’ 2”

9’ 1”

27%/15.0°

56’ 2”

3’ 4”

10’ 1”

29%/16.0°

58’ 11”

3’ 7”

IMPORTANT: Numbers in table based on 168.7’ (51.4 m) minimum bend radius, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 12’ 10” [3.9 m]) in the ground
before steering.