beautypg.com

Entry pitch, Minimum setback, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 72

background image

Prepare - 72

JT60/JT60 All Terrain Operator’s Manual

Plan Bore Path

Entry Pitch

Entry pitch is the slope of the drill frame compared with the slope of the ground. Determine entry pitch one
of two ways:

1.

With Pitch Beacon

Lay pitch beacon on the ground and read
pitch.

Lay pitch beacon on drill frame and read pitch.

Subtract ground pitch from drilling unit pitch.

2.

With Measurements

Measure from the ground to front end of drill
frame (H1).

Measure from the ground to back end of frame
(H2).

Subtract (H1) from (H2). Record this number.

Measure the distance between front and back
points (C).

Divide (H2-H1) by (C), then multiply by 100.
This is your pitch.

Minimum Setback

Setback is the distance from the entry point to where
pipe becomes horizontal (B1).

IMPORTANT: A shallow entry pitch (A1) allows you
to reach horizontal sooner and with less bending.
Increasing entry pitch (A2) makes minimum setback
longer and deeper.

NOTICE: If setback is too small (B2), you will
exceed bend limits and damage the pipe.

This manual is related to the following products: