Operation, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual
Page 157

JT60/JT60 All Terrain Operator’s Manual
Systems and Equipment - 157
Wireline Tracking
Operation
1.
Connect drill head, transition sub, and wireline beacon housing.
2.
Drill first pipe. After first pipe is downhole, clamp pipe in wrenches.
3.
Position next pipe in shuttles.
Read operator’s manual. Know how to use all controls before operating
machine. When you see this sign
on the machine or in the manual, read it and use
caution. Your safety is at stake.
Turning shaft will kill you or crush arm or leg. Stay away.
To help avoid injury: Ensure that thrust and rotation are disabled while tracking
specialist is working at front and rear of machine.
Moving parts could cut off hand or foot. Stay away.
To help avoid injury:
•
DO NOT operate pipe box, pipeloading, anchor, setup controls, or any other controls while tracking
specialist is making wireline connections.
•
Maintain constant two-way communication with tracking specialist.