beautypg.com

Bells, Pba-ac & mba-dc – Potter Releasing Systems User Manual

Page 67

background image

67

BELLS

PBA-AC & MBA-DC

PRINTED IN USA

PAGE 2 OF 2

MFG. #5400776 - REV Y

5/08

5 3/4”

(146)

1 5/8”

(41)

DWG# 776-2

3 3/8”

(86)

4 1/4”

(108)

3 3/8”

(86)

5”

(127)

Weatherproof Backbox Dimensions Inches (mm)

Fig. 2

Box has one threaded 1/2" conduit entrance

Wiring (rear view)

Fig. 3

Installation

1. The bell shall be installed in accordance with NFPA 13, 72, or

local AHJ. The top of the device shall be no less than 90" AFF and

not less than 6" below the ceiling.

2. Remove the gong.

3. Connect wiring (see Fig. 3).

4. Mount bell mechanism to backbox (bell mechanism must be

mounted with the striker pointing down).

5. Reinstall the gong (be sure that the gong positioning pin, in the

mechanism housing, is in the hole in the gong).

6. Test all bells for proper operation and observe that they can

be heard where required (bells must be heard in all areas as

designated by the authority having jurisdiction).

2 11/16”

(68)

DWG# 776-1

10”

(250)

8”

(200)

6”

(150)

Bells Dimensions Inches (mm)

Fig. 1

2” (51)

4 1/4” (108) 3 3/8” (85.9)

BBX-1

Failure to install striker down will prevent bell from operating.

This manual is related to the following products: