Chapter 4: installing hardware options, Chapter 4, Installing hardware options – Compaq PROLIANT 3000 User Manual
Page 62

4-1
ProLiant 3000 Setup and Installation Guide
Writer: Tom Erber Project: ProLiant 3000 Setup and Installation Guide Comments: 296908-002
File Name: E-CH04.DOC Last Saved On: 1/27/98 4:20 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Chapter 4
Installing Hardware Options
This chapter is divided into two major parts as follows:
■
Accessing Non Hot-Plug Areas - you must shut down the server power
in order to install options, upgrades or replacements in the following
areas:
❏
Processor boards and sockets
❏
Memory board and sockets
❏
System Board
❏
Drive Cage Backplane Board
❏
Power Supply Backplane Board
❏
Three shared PCI/EISA slots
❏
Five PCI slots
❏
Fans
■
Accessing Hot-Plug Areas - you can install hot-plug options, upgrades
or replacements without shutting down the power in the following areas:
❏
SCSI drive bays
❏
Power supplies
NOTE: The illustrations in this chapter may vary slightly depending on whether
you have a tower model or rack model.