beautypg.com

Mcs-08pb, Profibus gateway, Front view – Flintec MCS-08 User Manual

Page 40: Rofibus, Ateway

background image

MCS-08 Technical Manual, Rev. 1.04 December 2012

Page 40 of 52

10. MCS-08PB

P

ROFIBUS

G

ATEWAY

The MCS-08PB gateway module integrates up to 8 pcs. MCS-08AD A/D Converter modules and up to 8 pcs.
MCS-08IO Digital I/O modules to an external Profibus network. The MCS-08PB gateway module
communicates with other MCS-08 modules via the internal N-bus and responses to the PLC via Profibus DP.
The GSD file is available on a CD which is supplied together with the instrument.

10.1. Front View

There are 5 status LEDs on the front panel which indicate the operational module status (Refer to table 10.1)
and the Profibus status. The setup switch on front panel of the instrument is used for N-bus addressing without
PC (Refer to chapter 5.6) and for diagnostics (Refer to chapter 15).
When the error LED is ON, the other two LED indicate the error type (Refer to chapter 14 for details).
Profibus connection, power supply and serial interface terminals are located at the front of the DIN rail mount
module (See figure 10.1).

Status LEDs

Profibus connector

RS-232C connector

Setup Switch

Power Supply Terminal

Figure 10.1

– Front view


The meanings of these LEDs in operation are described below.

Status LEDs

Symbol

Name

Description

Pwr

Power

Module is energized
Module is de-energized. Check power cable

Lnk

Link

Communication takes place

No communication

Err

Error

Error. Refer to error table in chapter 14
No error

Off

On Off for 0.3 seconds

Table 10.1

– Status LEDs