Chapter 7: maintenance schedule, Chapter 7: inspection and maintenance schedule – AERCO Modulex EXT 1530 - 3060 User Manual
Page 113

MODULEX EXT
1530, 1912, 2295, 2677, 3060 BOILERS
Installation, Operation & Maintenance Manual
CHAPTER 7: MAINTENANCE SCHEDULE
The boiler must receive regular maintenance and cleaning in order to ensure reliable and
efficient operation. Regular maintenance will prolong the life of the boiler. Refer to Table 7-1 for
a suggested schedule of maintenance procedures.
The frequency of servicing will be determined by the service engineer and will depend on the
appliance’s condition.
CAUTION!
To ensure the continued safe and efficient operation of the boiler it
is highly recommended that it be checked at regular intervals and
serviced when necessary, and that only original spare parts be
used. Regular maintenance will prolong the life of the boiler.
WARNING!
If the boiler is not checked and serviced regularly it could cause
damage to the equipment and/or harm to persons.
Table 7-1: Modulex EXT Maintenance Schedule
Maintenance Operation
Check Once
a Year
Check Every
2 Years
Inspect for acceptable circulating and feed water quality
and chemistry.
●
Inspect gas assembly components.
●
Inspect safety devices for water and gas.
●
Inspect and clean the combustion chamber & 8 burners
●
Inspect and clean flame rod and ignitor.
●
Inspect and clean the fan/blower.
●
Check the operation of the fan/blower.
●
Check gas pressure and adjust if necessary.
●
Inspect and clean the flue exhaust assembly.
●
Check all water connections and valves.
●
Do combustion analysis and recalibrate if necessary.
●
Check electrical and electronic components
●
Inspect condensate drain and P-trap, clean if necessary.
●
Check flow switch in CSD-1 manifold for proper function
●
OMM-0095_0E
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Page 113 of 138
GF-139
Phone: 800-526-0288
12/01/14