beautypg.com

Installation guidelines, Formwork – Waterworks Formwork Deck Mounted Exposed Tub Filler with Handshower and Metal Joystick Handle User Manual

Page 3

background image


PRODUCT SUPPORT 800.927.2120 8am - 6pm EST

FORMWORK

Single Hole Deck Mounted Tub Fillers

INSTALLATION GUIDELINES

Page 3 of 4


4.17.2014

These guidelines have been prepared for the professional contractor to aid in the installation of:
FORMWORK DECK MOUNTED EXPOSED TUB FILLER (STYLE# FMXT30) AND DECK MOUNTED
EXPOSED TUB FILLER WITH HANDSHOWER (STYLE# FMXT50)
All dimensions are based on original specification and are subject to change and variation.
Please consult your Design Associate for current specifications.

¾ See Figure 4 for steps 10 - 12.

10. Remove NUT, METAL WASHER, & RUBBER

WASHER from the bottom of the SHANK.

11. Place ESCUTCHEON & SHANK through the hole in

the mounting surface, making sure the O-RING is
underneath.

12. Reinstall RUBBER WASHER, METAL WASHER &

NUT to secure ESCUTCHEON.

FIGURE - 04

¾ See Figure 5 for steps 13 - 16.

13. Thread CONICAL END of the HANDSHOWER HOSE

to the threading on the HANDSHOWER.

14. The CHECK VALVE HOUSING should be tightened

to the OUTLET HOSE. The BUSHING should be
tightened to the CHECK VALVE HOUSING using the
RUBBER WASHER in between.

15. Thread the HEX END of the HANDSHOWER HOSE

to the BUSHING that is connected to the CHECK
VALVE HOUSING.

16. The HANDSHOWER can now be placed into the

opening in the ESCUTCHEON.

¾ Note: The FLOW REGULATING CHECK VALVE is

located at the end of the HANDSHOWER and can be
accessed by removing the CLIP. The CHECK VALVE
is located in the CHECK VALVE HOUSING.

NUT

METAL WASHER

RUBBER WASHER

O-RING

SHANK

ESCUTCHEON

NUT

METAL WASHER

RUBBER WASHER

O-RING

SHANK

ESCUTCHEON

HEX END

HANDSHOWER

HOSE

BUSHING

RUBBER

WASHER

CHECK

VALVE

CHECK VALVE

HOUSING

OUTLET

HOSE

CONICAL

END

CLIP

FLOW

REGULATING

CHECK VALVE

HANDSHOWER

HEX END

HANDSHOWER

HOSE

BUSHING

RUBBER

WASHER

CHECK

VALVE

CHECK VALVE

HOUSING

OUTLET

HOSE

CONICAL

END

CLIP

FLOW

REGULATING

CHECK VALVE

HANDSHOWER

FIGURE - 05

FINISH AND INSPECT THE INSTALLATION:

17. Remove the AERATOR using the tool provided then

turn on the water supply and operate the JOYSTICK
HANDLE to ensure that it is functioning properly.

18. Flush out any debris in the supply lines before

operating the HANDSHOWER if applicable.


¾ FMXT50 ONLY: To operate the HANDSHOWER turn

the KNOB HANDLE on the mounting surface. A
PROGRESSIVE CARTRIDGE controls on, off and
temperature for the HANDSHOWER independently
from the SPOUT.

19. Inspect all connections for leaks then turn off the

water.

20. Re-install the aerator.

This manual is related to the following products: