Waterworks Boulevard Low Profile Three Hole Deck Mounted Lavatory Faucet with Crystal Lever Handles User Manual
Installation guidelines
Boulevard Lavator y Faucet With Lever Handles
These guidelines have been prepared for the professional contractor to aid in the installation of:
BOULEVARD LAVATORY FAUCET WITH LEVER HANDLES
(BDLS02-K) METAL LEVER & (BDLS03-K) CRYSTAL LEVER
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
1
NOTES
➢ Use only a protected, smooth-jawed, or strap wrench on any finished
surface.
➢ If possible, install this faucet assembly on the lavatory before setting.
INSTALLATION
➢ To remove the handle trim from the valve body, unscrew the cover and
pull off the handle and cover together (see fig. 1).
➢ DO NOT use putty on deck fittings. Upper and lower washers are
provided.
➢ Insert the valve body through the mounting hole and screw the cover
down until fully seated. Then, tighten the bottom locking nut to secure
the valve to the deck. Repeat for other valve assembly.
➢ Remove the locking nut, gasket and tee assembly from the spout shank
and insert spout through the mounting hole.
➢ Re-attach the locking nut and gasket to spout shank and tighten until
spout is secured.
➢ Re-attach the tee assembly, using the gasket provided.
➢ Install the flexible supply hoses between the valve bodies and the tee
assembly.
INSTALLING THE POP-UP DRAIN (see fig. 2)
➢ Remove the upper collar from the pop-up drain assembly and discard the
upper gasket.
➢ Set the upper collar in the lavatory drain opening, using a clear adhesive
silicone.
➢ Re-attach the lower drain assembly, using the gasket provided.Tighten until
fully secured and the side connector is facing towards the wall. A clear
adhesive silicone may be used to ensure a water-tight seal between the
gasket and lavatory.
➢ Remove the knurled nut from the side connection of lower drain
assembly. Then, insert the horizontal pivot rod and re-attach the knurled
nut.
➢ Insert vertical lift rod through the spout assembly and connect to the
horizontal pivot rod using the linkage provided (if necessary, the rods may
be field cut).
➢ To adjust the height of the drain stopper, turn the adjustment screw at
the base of the stopper and tighten the locking nut upward to secure.
➢ Attach the flanged tailpiece to the lower drain assembly using the gasket
provided. Then, connect the tailpiece to the P-trap.
➢ Using the basin nuts provided, attach the water supplies to the hot and
cold valve bodies.
➢ Check all connections for leaks.
➢ After installation, unscrew and remove the aerator assembly. Carefully
open the hot and cold valves fully to flush out any debris in the supply
lines. Once the lines have been flushed, close the valves, and reinstall the
aerator assembly.
➢ If further assistance is required, please contact Product Support at:
1-800-927-2120 (8am-7pm EST).
Figure 1
Cover
Valve Body
Locking Nut
Basin Nut
Stopper Assembly
Upper Collar
Upper Gasket
Lower Gasket
Lower Drain Body
Tailpiece Gasket
Tailpiece
Pivot Rod
Knurled Nut
Figure 2
W A T E R W O R K S
3
3
⁄
16
"
2
1
⁄
2
"
ш2
1
⁄
2
"
2
3
⁄
8
"
2
3
⁄
4
"
2
1
⁄
8
"
ш2
1
⁄
8
"
8"–12"
1
3
⁄
4
"max.
2
7
⁄
8
"
max.
1
5
⁄
8
"
max.
1
⁄
2
"
5
1
⁄
2
"
2
3
⁄
16
"
1"
7
5
⁄
16
"
1"
2
5
⁄
16
"
Optional Crystal Lever (BDLS03)
Note: Drilling hole size: 1
1
⁄
4
"
BDLS02-K (metal)
BDLS03-K (cr ystal)
11/02