beautypg.com

Waterworks Boulevard Low Profile Three Hole Deck Mounted Lavatory Faucet with Crystal Lever Handles User Manual

Installation guidelines

background image

Boulevard Lavator y Faucet With Lever Handles

These guidelines have been prepared for the professional contractor to aid in the installation of:
BOULEVARD LAVATORY FAUCET WITH LEVER HANDLES
(BDLS02-K) METAL LEVER & (BDLS03-K) CRYSTAL LEVER

All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.

Installation Guidelines

1

NOTES

➢ Use only a protected, smooth-jawed, or strap wrench on any finished

surface.

➢ If possible, install this faucet assembly on the lavatory before setting.

INSTALLATION

➢ To remove the handle trim from the valve body, unscrew the cover and

pull off the handle and cover together (see fig. 1).

➢ DO NOT use putty on deck fittings. Upper and lower washers are

provided.

➢ Insert the valve body through the mounting hole and screw the cover

down until fully seated. Then, tighten the bottom locking nut to secure
the valve to the deck. Repeat for other valve assembly.

➢ Remove the locking nut, gasket and tee assembly from the spout shank

and insert spout through the mounting hole.

➢ Re-attach the locking nut and gasket to spout shank and tighten until

spout is secured.

➢ Re-attach the tee assembly, using the gasket provided.

➢ Install the flexible supply hoses between the valve bodies and the tee

assembly.

INSTALLING THE POP-UP DRAIN (see fig. 2)

➢ Remove the upper collar from the pop-up drain assembly and discard the

upper gasket.

➢ Set the upper collar in the lavatory drain opening, using a clear adhesive

silicone.

➢ Re-attach the lower drain assembly, using the gasket provided.Tighten until

fully secured and the side connector is facing towards the wall. A clear
adhesive silicone may be used to ensure a water-tight seal between the
gasket and lavatory.

➢ Remove the knurled nut from the side connection of lower drain

assembly. Then, insert the horizontal pivot rod and re-attach the knurled
nut.

➢ Insert vertical lift rod through the spout assembly and connect to the

horizontal pivot rod using the linkage provided (if necessary, the rods may
be field cut).

➢ To adjust the height of the drain stopper, turn the adjustment screw at

the base of the stopper and tighten the locking nut upward to secure.

➢ Attach the flanged tailpiece to the lower drain assembly using the gasket

provided. Then, connect the tailpiece to the P-trap.

➢ Using the basin nuts provided, attach the water supplies to the hot and

cold valve bodies.

➢ Check all connections for leaks.

➢ After installation, unscrew and remove the aerator assembly. Carefully

open the hot and cold valves fully to flush out any debris in the supply
lines. Once the lines have been flushed, close the valves, and reinstall the
aerator assembly.

➢ If further assistance is required, please contact Product Support at:

1-800-927-2120 (8am-7pm EST).

Figure 1

Cover

Valve Body

Locking Nut

Basin Nut

Stopper Assembly

Upper Collar

Upper Gasket

Lower Gasket

Lower Drain Body

Tailpiece Gasket

Tailpiece

Pivot Rod

Knurled Nut

Figure 2

W A T E R W O R K S

3

3

16

"

2

1

2

"

ш2

1

2

"

2

3

8

"

2

3

4

"

2

1

8

"

ш2

1

8

"

8"–12"

1

3

4

"max.

2

7

8

"

max.

1

5

8

"

max.

1

2

"

5

1

2

"

2

3

16

"

1"

7

5

16

"

1"

2

5

16

"

Optional Crystal Lever (BDLS03)

Note: Drilling hole size: 1

1

4

"

BDLS02-K (metal)
BDLS03-K (cr ystal)

11/02