Waterworks Easton Classic Low Profile Three Hole Deck Mounted Lavatory Faucet with Oak Lever Handles User Manual
Installation guidelines
Easton
®
Lav Set ~ Covered
These guidelines have been prepared for the professional contractor to aid in the installation of:
EASTON
®
LAV SET ~ COVERED
(EALS01,EALS02-K,EALS03-K,EALS04-K,EALS05-K)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
1
SIDE VALVE INSTALLATION:
1. With the lock nut (13) and upper sealing gasket (12)
installed on the side valve (15), insert the side valve into
the hole in the mounting surface so at least
1
/
2
" of threads
are exposed.
2. Place the upper sealing gasket (11) onto the side valve and
then thread the base escutcheon (10) onto the side valve.
3. Thread the handle assembly (1-9) onto the side valve until
it stops. Hand tight is adequate; if this assembly is too tight,
the handle will bind.
4. Unthread the base escutcheon until it contacts the cover
(6) which will assure proper side valve height.
5. Tighten the lock nut up against the underside of the
mounting surface to secure the side valve.
6. Repeat these steps to install the second side valve.
SPOUT AND DRAIN INSTALLATION:
7. Loosen the slotted set screw (41) from the end of the tee
(37) and then pull off the lift rod tension assembly (41-44).
8. Loosen the packing nut (40) at the base of the tee,
unthread the tee nut (33) and remove the tee assembly
(32-40) and washer (31) from the spout shank (26).
9. Unthread and remove the spout mounting nut (30) and
rubber spout washer (29) from the spout.
10. Insert the spout assembly through the spout hole of the
mounting surface, reinstall the rubber spout washer and
then tighten the spout mounting nut to secure the spout
to the mounting surface.
11.Reattach the tee assembly and then make sure to tighten
the packing nut (40) to prevent leaks.
12.Reinstall the lift rod tension assembly, do NOT fully tighten
the nut (44) at the base of this assembly.
13.Connect each of the supply hoses (24) to the adjacent
side valve, making sure the hoses are not pinched/kinked.
14.Remove the upper collar (48) from the pop-up drain
assembly and discard the upper gasket (49).
15. Set the upper collar in the lavatory drain opening using a
clear adhesive silicone.
W A T E R W O R K S
®
Notes:
• Drilling hole size: 1
1
/
4
"
• 1
1
/
4
" flanged tail piece
included
Ш
2
1
/
2
"
Ш
1
9
/
16
"
Ш
1
5
/
8
"
1
3
/
4
"
5
7
/
8
"
3
/
8
"
12
1
/
8
" max
3
1
/
2
"
2
3
/
8
"
2
1
/
2
"
3
1
/
8
"
8"-12
1
1
/
2
"
max
5
1
/
2
"
2
1
/
8
"
1
1
/
4
"
Ш
2
3
/
8
"
3
1
/
2
"
3
1
/
2
"
3
1
/
2
"
Ш
2
3
/
8
"
3
1
/
2
"
EASL02-K
EALS03-K,04-K,05-K
EALS01(cross handle)
EALS02-K(metal lever handle)
EALS03-K(white porcelain lever handle)
EALS04-K(black porcelain lever handle)
EALS05-K(oak lever handle)
INSTALLATION GUIDELINES:
IMPORTANT:
➢ T
To
o e
en
nssu
urre
e tth
hiiss p
prro
od
du
ucctt iiss iin
nssttaalllle
ed
d p
prro
op
pe
errllyy,, yyo
ou
u m
mu
usstt rre
eaad
d aan
nd
d
ffo
ollllo
ow
w tth
he
esse
e ggu
uiid
de
elliin
ne
ess..
➢
➢ T
Th
he
e o
ow
wn
ne
err//u
usse
err o
off tth
he
e ffaau
ucce
ett m
mu
usstt kke
ee
ep
p tth
hiiss iin
nffo
orrm
maattiio
on
n ffo
orr
ffu
uttu
urre
e rre
effe
erre
en
ncce
e..
➢ Be sure your installation conforms to local codes.
➢ Refer to the specification and assembly drawings attached. Faucet
is sold partially assembled but shown fully disassembled for
illustrative and service purposes only.
➢ Inspect this product to assure you have all parts required for
proper installation.
➢ Use only a strap wrench or protected/smooth-jaw wrench on
any finished surface.
➢ If possible, install the faucet assembly on the sink or mounting
surface before setting.
➢ Do NOT use putty during this installation.
12/03