beautypg.com

Door stop cut length & installation, Step 1) door stop cut length and installation, Includes offset and center-set glazing) – EFCO 433 Series User Manual

Page 90: Fig. 127

background image

June 2012

PART NO. Y017

Page 90 of 90

Series 433 Triple Set Installation Instructions

SECTION X: Door Stop Installation

(Includes Offset and Center-Set Glazing)






Step 1) Door Stop Cut Length and Installation

Install the applied door stop into position on the door frame by spacing it off the

exterior face of the door frame at the appropriate dimension, depending on door
thickness. See Figures 126 and 127 below. Using STT6 fasteners 3" from each end

and 12" O.C., fasten the door stop to the door header and door jamb. After
determining that the door stops are in the correct position, apply the door stop cover

by snapping it into the door stop raceway.

SCREW SPLINE

JAMBS SIMILAR

8374

8357

9257

91559154

8373

[FIG. 127]

8373

9208

8374

1 63/64"

@ 1 3/4" DOOR

9154

9155

2 15/64"

@ 2" DOOR

91559154

4437

1 31/32"

@ 1 3/4" DOOR

9155

2 7/32"

@ 2" Door

9155

4437

[FIG. 126]

HORIZONTAL CUT LENGTH = DOOR OPENING WIDTH

VERTICAL CUT LENGTH = [DOOR OPENING HEIGHT minus HORIZONTAL

DOOR STOP HEIGHT minus THRESHOLD HEIGHT]