Series 433 Triple Set Installation Instructions

SECTION VIII: Installation

(Includes Offset and Center-Set Glazing)























Step 3) Anchoring the Head

For D.L.O.s 36" and narrower, the anchors must be spaced 6" from the jamb or

vertical members. For D.L.O.s 36" and wider, the outside anchors must be spaced 6"
from the jamb with the center anchor centered on the D.L.O. See Figure 38 below.

4G29

3G46

1 3/16"

REF.

2 11/16" REF.

6"

"VARIES"

FD

6"

FD

GREATER THAN 36"

FD

EQUAL

FD

EQUAL

6"

6"

FD

8372

8366

8363 SHOWN
8393 SIMILAR

1 1/8"

REF.

3 5/16" REF.

2 11/16" REF.

[FIG. 38]

LESS THAN OR EQUAL 36"

These recommendations are for general erection procedures only. For actual

job conditions, see the details on the shop drawings. For perimeter anchor
type and spacing, refer to the approved shop drawings or consult the project

design professional.