Step 8) glass installation, Structural glazed vertical through – EFCO 433 Series User Manual
Page 82
June 2012
PART NO. Y017
Page 82 of 90
Series 433 Triple Set Installation Instructions
TEMPORARY GLAZING
CLIPS (HGR1)
TEMPORARY
PIECES OF
GLAZING GASKET
D
C
D
D
B
A
SECTION IX: Glazing
(Includes Captured and Structural Glazed Mullion Systems)
Step 8) Glass Installation
Structural Glazed Vertical Through
- For the following steps use Figures 107 through 109.
A) Make sure the setting blocks are placed at 1/4 points in each D.L.O. or as required
on the architectural drawings. See Figure 99 on page 78.
B) Prior to glass install, place WM80 tape into position on SSG mullion.
C) Position the glass at the exterior of the framing with the head and sill face covers
removed. Lift the glass into the frame and onto the setting blocks; ensure the glass
does not wipe the WM80 tape out of position.
D) Shift the glass into the pocket in the perimeter jamb until there is the correct glass
bite on both edges of the D.L.O. (7/16" captured vertical or 3/4" SSG vertical).
E) Install the appropriate covers. Place temporary pieces of the glazing gasket along
the head, perimeter jamb, and sill. Place the temporary glazing clips in the structural
mullion race, and rotate to hold glass at the structural mullion. See Figure 108. Install
all glazing gaskets. See Figure 101 on page 79. Install the next lite before filling the
structural glazing gap. See Figure 110 on page 83.