7 completing the installation, Completing the installation -12, Section 3.7 – Cabletron Systems 2208 User Manual
Page 38
Chapter 3: Installation
Page 3-12
2H22-08R SmartSwitch 2208 User’s Guide
4.
Verify that a link exists by checking that the port RX LED is on
(flashing amber, blinking green, or solid green). Refer to
for
further LED indications and descriptions. If the RX LED is off and the
TX LED is not blinking amber, perform the following steps until the
RX LED is on:
a.
Check that the power is turned on for the device at the other end of
the link.
b.
Verify proper crossover of fiber strands between the applicable
port on the 2H22-08R and the fiber optic device at the other end
of the fiber optic link segment.
c.
Verify that the fiber connection meets the dB loss specifications
outlined in
If a link has not been established, contact the Cabletron Systems Global
Call Center. Refer to
for details.
3.7
COMPLETING THE INSTALLATION
After installing the 2H22-08R and any optional Fast Ethernet Interface
Modules, and making the connections to the network, proceed as follows:
1.
Secure the cables by running the cables along the strain-relief bracket
and tying them to the strain-relief bracket using cable ties.
2.
The 2H22-08R is now ready to be set up through Local Management.
Refer to
access and use Local Management to configure the 2H22-08R.