Start test, Get latest test results – ADS Environmental Services XiLog+ QR 775026 A0 User Manual
Page 37

ADS XiLog+ System User Manual
31
Start Test
Selecting this button initiates the signal strength test. The logger will begin
measuring the signal strength once the delay period has passed. A counter will
count down the time until the test is due to begin to allow sufficient time for
placing the logger in the appropriate position. This counter also will be used
to identify the end of the test.
When the test is complete, recover the logger and read the results.
Get latest test results
Selecting this button displays the results from the last signal strength test
recorded by the logger and indicates the quality of the results (good, adequate,
or inadequate).