External power voltage, Gms signal strength, Signal strength test – ADS Environmental Services XiLog+ QR 775026 A0 User Manual
Page 36: Interval between samples, Delay before test start, Sample count

ADS XiLog+ System User Manual
30
External Power Voltage
This field displays the external power voltage measured by the logger. If the
logger is attached via USB, PrimeWorks will display the USB voltage being
supplied to the logger (typically 5 volts). If the voltage is requested remotely,
PrimeWorks will display the voltage coming from the external power supply.
GMS Signal Strength
This field indicates the current GSM signal strength measured by the logger
currently (provided the logger is powered up to the GSM network) or the last
time it was on-line.
Signal Strength Test
The signal strength test verifies the logger can communicate with the cellular
network at the current location (of potential deployment).
Signal Strength sub-window
Interval Between Samples
This field indicates the amount of time in seconds between each test sample.
Modify this setting manually or using the up/down arrows.
Delay before test start
This field displays the amount of time in seconds to delay before initiating the
test. The delay period begins when PrimeWorks sends the command to the
logger to initiate the signal strength test. Modify this setting manually or
using the up/down arrows.
Sample Count
This field indicates the number of test samples to take during the test. Modify
this setting manually or using the up/down arrows.