C h a p t e r 2 deploying the xilog, Deploying the xilog – ADS Environmental Services XiLog+ QR 775026 A0 User Manual
Page 19

ADS XiLog+ System User Manual
13
C H A P T E R 2
Deploying the XiLog+
Deploying an ADS XiLog+ logger typically involves the involves the
following steps:
1. Programming the XiLog+
2. Performing a Signal Strength Test
3. Installing the XiLog+ at the Location
Deploy XiLog+ data loggers in a similar manner to other comparable units.
However, consider the following factors concerning GSM capabilities and
requirements during deployment:
• Mount the logger in an upright position, not at an angle or on its side.
• When installing the logger underground, mount the logger as close as
possible to ground level, preferably within 6 inches of the surface.
Following these guidelines will help ensure the GSM functions most
effectively. This chapter provides detailed instructions for each step in the
deployment process.