beautypg.com

Airbox operation, Monitor operation – Great Plains YP4425A Operator Manual User Manual

Page 47

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

43

2012-02-23

Table of Contents

Index

401-805M

Airbox Operation

Refer to Figure 45
The function of the airbox

is to mix seed with turbulent

air from the hydraulic fan, which then exits through a
manifold (not shown) to the seed tubes which serve the
row unit meters.

Note: Before the first planting each season, or when

using new meters or meter wheels for the first time,
or at the start of each season, before filling with
seed, add

1

3

cup (80 ml) graphite to bottom of

airbox.

When starting empty you must blow seed out to the
meters for two to four minutes to fill meters.

The monitor has a level sensor below the hopper or seed
box to warn when seed box is empty. There are three to
four acres of seed in the system when the sensor first
indicates box empty, depending on seeding rate.

Monitor Operation

Monitor operation is described in a separate manual
supplied with your YP4425A Planter.

Operations covered in that manual (and therefore not in
this manual) include:

• hydraulic drive control

• seed rate calibration

• planting rate

• fertilizer rate

• setting rate limits and detecting out-of-limits

• GPS integration

• fan rpm

Figure 45

Air Box

29309

1

1

Figure 46

Seed Monitor Console

29801