beautypg.com

Field operation, Planting, Checking planting rate – Great Plains 3PYP Operator Manual User Manual

Page 47: Field operation planting checking planting rate

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

43

2014-09-09

Table of Contents

Index

401-312M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 21
and “Field Set-Up Checklist” on page 41.

Planting

When all checklist items are complete, a planting pass
normally consists of a few simple steps:

Pass 1 (with marker extended)

1.

Lower planter (Hitch then Lift)

2.

Drive forward

3.

Scan monitors and controls. Check for errors, alerts
and out-of-limits events. Check planting rate reports.

4.

At end of pass, stop.

5.

Raise planter (Lift then Hitch)

6.

Extend/retract marker as needed for next pass

7.

Turn

Subsequent Passes

8.

Resume at step 1.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

Checking Planting Rate

Although your seed monitor reports useful full pass
results, cautious practice includes manually checking the
seed rate early in the first pass.

The Seed Rate Chart book for this planter (manual part
number 401-312B) contains sampling instructions.

First Pass Operation

Page

Fold up marker.

34

Raise planter and line up at start of first
planting row

22

Set tool bar height to 26 inches.

18

Set tractor 3-point hitch to “depth
control” operation (and not load control)
If tractor hitch is set for load control,
planting depth will be uneven.

Unfold marker on next-row side.

33

Turn on seed fan. Adjust hydraulic flow
for 3800 rpm.

35

If planter is equipped with hydraulic
drive, engage drive via seed monitor.
Refer to seed monitor manual.

If planter has a fertilizer system, turn on
the pump. Refer to pump manual.

On CLUTCH switch control panel, set
all switches to ON.

30

Pull forward, lower planter, and begin
planting for a short distance.

Stop. Assess:
planting depth
seed spacing
press wheel operation

Make necessary adjustments

46

Turns

Page

1. Stop at completion of row

2. Fold marker

34

3. Raise planter

22

4. Make turn

5. Lower planter

22

6. Unfold marker on next-row side.

33

7. Begin planting.

Suspending Planting

Page

1. Stop tractor

2. Shut off seed fan

35

3. Shut off fertilizer pump

4. Raise planter

22

5. Shut off hydraulic drive (if equipped)

6. Fold Marker

34

7. Tilt Marker down

34

Ending Planting

Page

1. Suspend operations as above, then

2. Install lift assist locks

26

3. Steering OFF

39

4. Lights ON

5. Transport

26