beautypg.com

3 operation, 1 handling the sp module a – Metrohm 793 IC Sample Preparation Module User Manual

Page 27

background image

3.1 Handling the SP Module A

793 IC Sample Prep Module/ 8.793.1003 Instructions for Use

23

3 Operation

3.1

Handling the SP Module A

General

The SP Module A of the 793 Sample Prep Module consists of a total

of three cation exchange units which are in turn used for cation ex-

change, regenerated and rinsed with water. In order to record each new

chromatogram under comparable conditions a freshly regenerated

cation exchange unit is normally used. Switching is either carried out

automatically together with valve switching or manually.

Correct connections

The three inlets and outlets numbered 1...3 on the SP Module A each

have 2 permanently mounted PTFE capillaries, which must be con-

nected as described in sections 2.3.2 or 2.4.2 respectively (see Fig. 6).

Flow direction

The cation exchange units must never be regenerated in the same

flow direction used for the sample. You should thus always install the

inlet and outlet capillaries as described in sections 2.3.2 or 2.4.2

respectively according to the scheme shown in Fig. 6.

Never switch when dry

The SP Module A must never be switched in the dry state as there is

a danger of blocking.

No recycling

The recycling process (returning the eluent to the storage vessel)

must not be carried out when the SP Module A is in operation.