Metrohm 793 IC Sample Preparation Module User Manual
Page 30
3 Operation
793 IC Sample Prep Module/ 8.793.1003 Instructions for Use
26
Switch on:
>PROGRAM/edit XXX.X min
remote
1
✴✴✴✴✴✴✴
Switch off:
>PROGRAM/edit XXX.X min
remote
0
✴✴✴✴✴✴✴
Switch pump on/off at an event
In the 732 IC Detector the
program a maximum of 4 different events (see section 4.7.3 of
732/733 Manual). The pump can be switched on or off at any
event by setting the remote output lead 1 to 1 (on, active, 0 V) or
0 (off, inactive, open) respectively:
Switch on:
EVENT YY-MM-DD HH:MM:SS
remote
1
✴✴✴✴✴✴✴
Switch off:
EVENT YY-MM-DD HH:MM:SS
remote
0
✴✴✴✴✴✴✴
Switch on remote control of the SP Module A
ON
OFF
REMOTE
In order to bring the SP Module A automatically to the next
position via the 732 IC Detector the remote control of the SP
Module A must be switched on with switch 6
666.
ON
Remote control switched on
OFF
Remote control switched off
Rotate SP Module A in a program
In the 732 IC Detector the
create time programs with a maximum of 20 program steps (see
section 4.7.1 of 732/733 Manual ). With each program step the SP
Module A can be brought to the next position by setting remote
output lead 2 to 1 (on, active, 0 V). This lead must later be
returned to the setting 0 (off, inactive, open) before the SP
Module A can be switched to the next position.
Rotate:
>PROGRAM/edit XXX.X min
remote
✴
1
✴✴✴✴✴✴
Reset
output lead:
>PROGRAM/edit XXX.X min
remote
✴
0
✴✴✴✴✴✴
Example
Automatically changing the SP
Module A position in "inject"-
programs (for manual operation
or with autosamplers).
PROGRAM
progr.type: inject
0.0 remote
✴
✴
✴
✴
1
✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴
0.1 remote
✴
✴
✴
✴
0
✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴✴
✴
✴
✴