beautypg.com

Metrohm 793 IC Sample Preparation Module User Manual

Page 17

background image

2.3 Connection to a Modular IC System for Neutralization

793 IC Sample Prep Module/ 8.793.1003 Instructions for Use

13

5 Attach pump tubings

x Loosen both tubing cartridges 4

444 from the holding clamp 9999 by

pressing down snap-action lever 10

10

10

10 and remove from mount-

ing pin 12

12

12

12 on 793 Sample Prep Module (see Fig. 1).

x Press contact pressure lever 5

555 on both tubing cartridges

down as far as it will go.

x Insert a length of pump tubing 33

33

33

33 (6.1826.010, ~1.3 mL/min)

into each of the tubing cartridges as shown in Fig. 7. The

white-white stopper 34

34

34

34 must click into the corresponding

holder on the left-hand side of the tubing cartridge.

x Place the tubing cartridges on mounting pin 12

12

12

12 and press

down on the right-hand side until snap-action lever 10

10

10

10 clicks

into position on holding clamp 9999. Take care that no kinks are

formed in the pump tubing.

30

30

30

30

32

32

32

32

33

33

33

33

34

34

34

34

4444

5555

34

34

34

34

35

35

35

35

25/28

25/28

25/28

25/28

10

10

10

10

36

36

36

36

31

31

31

31

31

31

31

31

Fig. 7: Installing pump tubings

4444

Tubing cartridge

31

31

31

31

PEEK compression fitting

(6.2744.010)

5555

Contact pressure lever

32

32

32

32

PEEK coupling (6.2744.030)

10

10

10

10 Snap-action lever

33

33

33

33 Pump tubing (6.1826.010)

25

25

25

25

SP Module A inlet capillary

for HClO

4

34

34

34

34 Stopper (white-white)

28

28

28

28 SP Module A inlet capillary

for H

2

O

35

35

35

35 PEEK coupling (6.2744.110)

30

30

30

30

PTFE tubing (6.1803.020)

36

36

36

36 PEEK filter unit (6.2821.100)