Chapter 2, Start up, Prepare for drive start-up – Rockwell Automation LPM20 Liquid-Cooled AC Drive with High Performance Drive Control User Manual
Page 51: Before applying power to the drive, Prepare for drive start-up -1

Chapter
2
Start Up
This chapter describes how to start up the LPM20. Refer to
a brief description of the LCD HIM (Human Interface Module).
Prepare For Drive Start-Up
Before Applying Power to the Drive
Important: If you have a DriveLogix application, you must first connect
the battery before starting this procedure.
❏ 1. Confirm that motor wires are connected to the correct terminals and are
secure.
❏ 2. Confirm that encoder wires are connected to the correct terminals and
are secure.
❏ 3. Confirm that all inputs are connected to the correct terminals and are
secure.
❏ 4. Verify that AC line power at the disconnect device is within the rated
value of the drive.
❏ 5. Verify that control power voltage is correct.
The remainder of this procedure requires that a HIM be installed. If an
operator interface is not available, remote devices should be used to start
up the drive.
For information on ...
See page ...
!
ATTENTION: Power must be applied to the drive to perform the
following start-up procedure. Some of the voltages present are at
incoming line potential. To avoid electric shock hazard or damage
to equipment, only qualified service personnel should perform the
following procedure. Thoroughly read and understand the
procedure before beginning. If an event does not occur while
performing this procedure, Do Not Proceed. Remove Power
including user-supplied control voltages. User-supplied voltages
may exist even when main AC power is not applied to the drive.
Correct the malfunction before continuing.