Connecting synchlink, Class 1 led product, Connecting synchlink -32 – Rockwell Automation LPM20 Liquid-Cooled AC Drive with High Performance Drive Control User Manual
Page 44
1-32
Installation/Wiring
Connecting SynchLink
SynchLink provides high-speed synchronization and communication
between multiple LPM20 drives with High Performance Drive Control (or
other products with SynchLink capability).
Class 1 LED Product
When planning and connecting the SynchLink network, please refer to the
SynchLink System Design Guide (Publication No. 1756-TD008).
Connect cables to J1 (transmit) and J2 (receive) connectors on the left side
of the Main Control Board. Push the plug into the socket until it produces an
audible click.
Important: Do not overtighten tie-wraps.
!
ATTENTION: Hazard of permanent eye damage exists when
using optical transmission equipment. This product emits intense
light and invisible radiation. Do not look into module ports or
fiber optic cable connectors.
Table 1.L SynchLink Cables and Accessories
Description Cat.
No.
2 x 1 M Fiber Optic Link
1403-CF001
2 x 3 M Fiber Optic Link
1403-CF003
2 x 5 M Fiber Optic Link
1403-CF005
10 M Fiber Optic Link
1403-CF010
20 M Fiber Optic Link
1403-CF020
50 M Fiber Optic Link
1403-CF050
100 M Fiber Optic Link
1403-CF100
250 M Fiber Optic Link
1403-CF250
500 M Fiber Optic Bulk
1403-CFBLK
J2 (Receive)
J1 (Transmit)