beautypg.com

Magna-loc, Z-closure installation – Metal Sales Magna-Loc Installation User Manual

Page 79

background image

© Metal Sales Manufacturing Corporation / Subject to change without notice 6/12

79

MAGNA-LOC

z-CLOsure INstALLAtION

INstALLAtION NOtes

Magna-Loc Z-Closure

Field cut and bend back 1"

Double Bead Tape Sealant

Field cut and bend back 1"

1. Place a row of Double Bead Tape Sealant across panel and over each rib approximately 4" from panel end. Before

proceeding, make sure Z-Closure placement will accomodate flashing.

2. Field cut the Z-Closure 2" longer than the panel width. Snip the top and bottom leg of the Z-Closure and bend both sides

back (as shown above).

3. Fasten through the Z-Closure, Tape Sealant, Magna-Loc panel, and substrate with appropriate fasteners.

Note: For Open Framing, the substrate will be the Back-Up Channel shown in the details.

4. Apply a row of Double Bead Tape Sealant across the top of the Z-Closure filling any gaps or openings around the panel

ribs. This will be fastened through when the flashing is installed.

Slope

#12-14 x 1" SD NW

(or) #10-12 x 1" PHW

3:12 slope

Minimum