3 evaluation with standard curve/line, Evaluation with standard curve/line, Ac f – Eppendorf D30 BioPhotometer User Manual
Page 75

75
Evaluation procedure
Eppendorf BioPhotometer
®
D30
English (EN)
The factor is either entered directly as a parameter during the "Factor" evaluation procedure or calculated 
during the "Standard" evaluation procedure (evaluation with a standard concentration):
F = calculated factor
C
S
= concentration of the standard (enter as parameter).
A
S
= measured absorbance of the standard.
If multiple measurement (2 or 3 replicates) has been programmed for the standard, the average value is 
calculated from the measured absorbance values and inserted as A
S
.
12.3
Evaluation with standard curve/line
If evaluations are made with more than one standard, the following evaluation procedures for the standard 
curve/line can be selected with the [Curve fit] in the 
measure standards/new method step:
For the regression procedure, one can select that the regression line (regression curve) goes through the 
zero point.
Evaluation procedure
Description
Minimum required number of 
standard points
Linear interpolation
Linear point-to-point connection 
in the absorbance concentration 
graph of the standard evaluation.
2 standards minimum.
Linear regression
Polynome regression for first 
degree polynomial.
3 standards minimum.
Quadratical regression
Polynome regression for second 
degree polynomial.
4 standards minimum.
Cubical regression
Polynome regression for third 
degree polynomial.
5 standards minimum.
Spline interpolation
Interpolation via natural cubic 
splines.
3 standards minimum.
S
S
A
C
F
