beautypg.com

Test sequence -19 subtests -19, Test sequence, Subtests – Toshiba Satellite Pro 4320 User Manual

Page 167

background image

User's Manual

Troubleshooting 9-19

Version

1

Last Saved on 27/01/00 18:20

Satellite Pro 4200/4300 User's Manual – 4200_UK.doc – ENGLISH – Printed on 27/01/00 as IM_420UK

Test sequence

The diagnostic test checks the computer and attached peripherals in the
following sequence:

1.

System test

2.

Memory test

3.

Display tests

4.

Floppy Disk (Diskette) test

5.

Hard disk test

6.

Printer test

When a test is in progress, the program displays:

IN PROGRESS TTSSDSS

where TT indicates the test number, the first SS indicates the subtest
number, D indicates the drive (if tested), and the second SS indicates the
hardware status.

Subtests

The following gives details on each subtest:

System/memory

The System and Memory tests run together for about one minute. The
System test displays no messages. The Memory test displays the
following message:

MEMORY TEST IN PROGRESS XXXXXX

where xxxxxx is the current memory location being tested. The memory
test includes conventional and extended memory.

If either test aborts:

1.

Write down everything that appears on screen.

2.

Press Ctrl + Pause (Break) or Ctrl + C to return to the diagnostics menu.

3.

Consult your dealer.